Our website use cookies to improve and personalize your experience and to display advertisements(if any). Our website may also include cookies from third parties like Google Adsense, Google Analytics, Youtube. By using the website, you consent to the use of cookies. We’ve updated our Privacy Policy. Please click on the button to check our Privacy Policy.

Middletown North and South High Schools

OEM Gone…But New Membrane System Goes On

Middletown Township Public School District
Middletown, NJ

Challenge

The original manufacturer of the fabric structure gyms at this school district’s North and South High Schools had gone out of business.  The buildings still functioned well but the exteriors badly needed to be refurbished, preferably during the summer when school was out.   

Middletown North and South High Schools

Signature Solution

Having refurbished countless structures from ALL manufacturers—including this extinct OEM—Signature was the ideal partner for this project.  Inspecting, maintaining, repairing and refurbishing all fabric structures is our core specialty.  The solution for these two buildings included a system of large membrane panels covering the existing roof and walls.  Our answer was also designed to minimize interior work (and cost) by allowing all hanging systems to remain in place.

Middletown North and South High Schools

Result

While school was out for the summer, Signature’s team successfully refurbished both structures on time and on budget.  A new tensioning system and architectural grade Ferrari-brand membrane now ensure many years of cost-effective utility for this value-focused school district..and its taxpayers.

Project Facts

  • Two (2) Titan Series 4 Structures; the OEM has been out of business for over a decade.
  • Size: Each building is 100’ x 210’, 21,000 sq. ft.; 42,000 sq. ft. total
  • Timing:  Entire refurbishment project for both buildings completed during summer recess.

Click Here to Download PDF

Middletown North and South High Schools